okay nason's classes. it's time to get back on track. there's a lot of work due wednesday, so make sure you get it done. there will be no extension issued for these two parts, and no excuses for not having it done and done well. if you don't know how to do something, find out. ignorance is not acceptable with the resources you obtain.

p_01. building tutorial must be 100% complete and done well. do something different to show
you did it and learned from it. five jpegs of the building in process and one at least 2 of
the final product must be in your class-network folder before the start of class on
wednesday.
p_02. build a rev-it model of your entire gallery. do it well and do it as detailed as possible. put
at least 3 jpegs of your final product in your class-network folder before the start of
wednesday's class. mediocrity is not an option here. if you are caught up on the tutorial,
this will not be a bad work load. if you failed to complete the week-long assignment that
was due today, you are in for some long nights, and you will get no sympathy from me. if
your gallery is the underwood center, do not model the entire thing. you can either model
a section of it comparable to the other galleries, join with other underwoodians and share
sections to compile a complete model or you can pick one of the smaller galleries and
model it out in explicit detail.

check your email for more details. i sent out a mass email to both sections describing the assignment in a little more detail. good luck and do a good job. i need to see some proof of effort on these. i am rather disappointed by the majority of the buildings and modelings i have seen as of late.